| Click on images for a larger image. |
 |
O'Donnell Hall before the rennovation |
| September 2006- the rennovation begins. |
 |
 |
 |
| By mid-October the porch is gone and side panes are gone. |
 |
 |
 |
| Windows are framed in and ground work is being done for the addition. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| November 2006. The south side has exterior sheetrock. |
 |
 |
 |
| December 2006. Ground work on new addition is underway. |
|
 |
 |
| March 2007. The groundwork for the addition is nearly done. The main floor and most of the top floor are framed and sheet rocked; the bottom floor is framed in. |
|
 |
 |
|
 |
 |
|
 |
 |
| May 2007. The new addition is going up; the roof is on, the floors are poured and the main floor is mostly framed in. In the older part of the building, the main floor and most of the top floor are framed, sheetrocked, taped anad painted. The bottom floor is framed in and sheetrocked. |
|
 |
 |
|
 |
 |
|
 |
 |
| June 12 2007. Exterior sheetrock is going up on the new adition. |
|
 |
 |
| September tour of O'Donnell to see progress. |
 |
 |
 |
| December 2007 |
 |
|
|